Boeing 777-8 Freighter reaches advanced assembly stage at Everett; engines still to be installed
Images from Boeing’s Everett factory show the first 777-8 Freighter structurally complete and nearing completion, with the next step being engine installation. The milestone adds physical momentum to a programme that has also been advancing through FAA certification and testing approvals.